Construction of a new LGN terminal in Dunkerque. Lincon contributed by reducing the construction time of the Jetty by converting the in-situ designed superstructure into a prefab design.

Our clients: Joint venture EMCC-Geka (Dimco), Martens Prefab Beton, Haitsma.